Cooling Tower Replacement

Guernsey Electricity Limited (GE) is the sole commercial electricity supplier on the island of Guernsey. GE has been operating for over 100 years, moving from local generation of power from coal, and later oil, to investing in cables to connect into the grids in Jersey and France through the Channel Islands Electricity Grid.

Vistech proposed four packaged cooling towers offering the fastest delivery, assembly and installation times.

Background

Mauris at odio velit. Donec laoreet diam mauris, nec sodales augue tristique quis. Integer sagittis mi quis ante egestas, et consectetur tortor pellentesque:

  • Nulla molestie commodo turpis vitae sodales. Nulla sit amet felis elit.
  • Morbi eu libero vitae est gravida sodales sed sed nisl. Lorem ipsum dolor sit amet, consectetur adipiscing elit.
  • Etiam eget volutpat nisi.
  • Pulvinar dignissim lacus. Nullam aliquam bibendum nulla, vitae accumsan orci porttitor ac.

Client requirements

Proin mi tortor, condimentum ac pharetra quis, aliquam quis eros. Vestibulum et ante tempus, convallis tortor nec, auctor eros. Integer quis nunc fringilla, posuere orci ut, elementum eros.

Turn Key Solutions

Suspendisse mauris arcu, cursus a congue eget, ultricies eget odio.

Maecenas dignissim

Phasellus condimentum enim orci, quis molestie ante condimentum nec.

Aliquam posuere nibh

Nunc pellentesque, at imperdiet neque convallis.

Donec pretium

Lorem aliquam ante convallis accumsan. Pellentesque habitant.

The solution

Praesent hendrerit ex urna. Maecenas commodo sapien vitae feugiat blandit. Nunc convallis nibh a nibh lacinia ullamcorper. Sed eu molestie metus, eget pharetra lacus. Curabitur et imperdiet justo. Vivamus scelerisque est sodales ultrices interdum. Aenean eget lectus imperdiet, fringilla tellus pharetra, faucibus mauris.

  • In a volutpat ex. Praesent quis lectus aliquam diam venenatis iaculis. Sed rutrum maximus tristique.
  • Vestibulum non neque vitae dolor bibendum laoreet et eu sapien
  • Mauris non augue condimentum, posuere velit vel, euismod elit. Duis tellus erat, faucibus pharetra eleifend a, ornare sed mauris.

Key features of the cooling towers

Minimal operating noise levels

Minimal operating noise levels

Distilleries within proximity to residential areas should consider limiting operating noise by introducing sound attenuators to the cooling units. Vistech offers several discharge attenuator options to best suit your requirements. Our sales engineers can discuss this in depth at the design stage. It’s also possible to install attenuators retrospectively, on existing units.

Blend in with the natural surroundings

Blend in with the natural surroundings

Many of our distillery clients reside in protected areas of outstanding natural beauty. With the option of colour selection on our GRP cooling towers and coolers, your system blends in with its natural surroundings. In addition, the adiabatic coolers emit no plume, greatly reducing its overall visual impact.

Minimal operating noise levels

Minimal operating noise levels

Distilleries within proximity to residential areas should consider limiting operating noise by introducing sound attenuators to the cooling units. Vistech offers several discharge attenuator options to best suit your requirements. Our sales engineers can discuss this in depth at the design stage. It’s also possible to install attenuators retrospectively, on existing units.

Programme of works

1 july

Project starts

12 july

Lining work completed

30 july

Assembly and installation of steelwork

5 august

Lift in towers & pipework installation

19 august

Electrical installation

19 august

Project complete

Following review of the proposal Vistech was selected as the supplier based on the proposed engineering solutions, ability to deliver within a required time together with resources and experience.

Having been selected as the supplier Vistech produced all drawings and technical documentation as required and were always available to discuss any changes or questions as required. During the design stage of this project other operational situations within our business meant the timescales had to be altered and the project delivered to a quicker completion date and Vistech were able to support this and deliver the project ahead of schedule...

Dean Vizia Lead Operations Engineer
Download the full case study as PDF
Download PDF

Get in touch

The Vistech team are always happy to help with any stage of your cooling system project.

    Get in touch

    First Name *

    Last Name *

    Email *

    Telephone

    Your Enquiry*

    They trust us

    • Diageo Logo
    • Piramal Healthcare Logo
    • CBRE LOGO