01 — The Project

Background

Old Fan Units
Old Fan Units
Old Distribution System
Old Distribution System

The site comprised two ageing Visco cooling towers serving a high-value London commercial property. The towers were originally constructed with:

  • 316 stainless steel casing

  • Mild steel centrifugal fans

  • Gravity-fed distribution

  • Ageing packing and drift eliminators

While structurally sound, performance and compliance standards had evolved. The towers required upgrading to meet revised duty requirements without full replacement.

In Central London, traditional replacement would have introduced significant logistical challenges:

  • Road closures and cranage

  • Structural loading reviews

  • Pipework re-routing

  • Control system modifications

  • Programme disruption

The client required a refurbishment partner capable of upgrading non-Vistech towers, working within tight urban constraints, and delivering a long-term engineered solution.

02 — Requirements

Client Requirements

The project required:

    • Increased thermal performance to meet revised duty
  • Upgrade from gravity distribution to spray system

  • Replacement of pack and drift eliminators to anti-legionella standard

  • Improved access and maintainability

  • Replacement of fans with high-efficiency stainless assemblies

  • Installation of safe internal working platforms

  • Minimal external disruption

  • Sequential works to maintain site resilience (one tower at a time)

Additionally, the solution needed to comply with ACOP L8 and HSG274 guidance while enhancing long-term reliability.

01

Increased Thermal Performance

The existing cooling towers were required to meet an updated duty, necessitating improved heat rejection performance without full system replacement.

02

Spray Distribution Upgrade

The ageing gravity-fed distribution system required replacement with a modern spray system to improve water coverage, efficiency and overall cooling performance.

03

Anti-Legionella Compliance

Packing and drift eliminators required upgrading to high-efficiency anti-legionella components to meet ACOP L8 and HSG274 compliance standards.

04

Improved Access & Maintainability

The system required enhanced internal access to enable safe inspection, cleaning and long-term maintenance in line with best practice guidance.

05

High-Efficiency Fan Replacement

Existing mild steel fan assemblies required replacement with stainless steel, high-efficiency units to improve reliability, durability and energy performance.

06

Central London Delivery Conastraints

The refurbishment needed to be completed without cranage, road closures or major structural modifications, minimising disruption within a high-value London site

03 — Solution

Solution

Vistech delivered a complete engineered refurbishment of both towers, demonstrating our capability to modernise and upgrade towers manufactured by other OEMs.

Key Engineering Interventions:

1. Stainless Steel Fan Upgrade

The existing mild steel centrifugal fan units were removed and replaced with:

  • 316 stainless steel split casings

  • 316 stainless steel DIDW impellers

  • Precision-ground stainless shafts

  • Auto-lubrication systems

  • Siemens IE4 high-efficiency motors

Split casings allowed roof manoeuvring without cranage — critical in a Central London environment.

2. Gravity to Spray Distribution Conversion

The ageing gravity system was replaced with a high-efficiency spray distribution system constructed from:

  • GRP reinforced uPVC

  • Stainless steel fittings

This improved water distribution uniformity, increased thermal performance and supported the increased pack depth

3. High-Efficiency Anti-Legionella Packing

New modular 12mm flute anti-legionella PP packing (800mm depth) was installed.

Benefits included:

  • Lower pressure drop

  • Easy removal for inspection (aligned with HSG274 Pt1 guidance)

  • Self-supporting welded construction

  • Long-term UV and chemical resistance

4. Stainless Steel Framed Drift Eliminators

New stainless-framed cellular eliminators were installed with:

  • <0.0005% drift loss

  • T-bar air seals to prevent bypass

  • Closed-cell design maximising droplet capture

  • ACOP L8 compliance

5. Cleansafe Flooring & Access Improvements

To improve safety and maintainability:

  • GRP Cleansafe flooring installed beneath pack

  • New stainless steel access doors added

  • Sump doors replaced and resealed

  • Horizontal casing joints split and re-masticed

This created a safe internal maintenance platform and extended casing service life.

04 — Delivery Capabilities

Vistech Delivery Capabilities

Central London Delivery

The refurbishment was delivered within a constrained Central London environment, avoiding:

  • Cranage

  • Road closures

  • Structural modifications

  • Pipework reconfiguration

Split fan casings and modular internals enabled manual roof manoeuvring, reducing programme risk and minimising disruption.

Asset Life Extension

By retaining the existing 316 stainless steel casing, the project avoided unnecessary embodied carbon and extended asset life—while delivering an upgraded system that, in key areas, exceeds typical new galvanised replacement standards.

Engineering-Led Approach

Rather than replacing plant, Vistech re-engineered critical performance drivers, including:

  • Air movement efficiency

  • Water distribution uniformity

  • Heat transfer capacity

  • Drift control and compliance

  • Access, safety and maintainability

Multi-OEM Refurbishment Capability

Vistech successfully upgraded Visco-manufactured towers, demonstrating our ability to deliver engineered retrofit solutions across multiple OEM platforms.

Our refurbishment approach is not constrained by original manufacturer limitations, enabling performance-driven upgrades tailored to site requirements.

05 — Programme

Programme

  1. 1
    Week 1

    Site mobilisation, isolations and initial strip-out of existing cooling tower internals

  2. 2
    Week 2

    Removal of existing fan assemblies, distribution system and redundant components

  3. 3
    Week 3

    Mechanical preparation & GRP Lining of casing, surface cleaning and resealing of horizontal joints

  4. 4
    Week 4

    Installation of new stainless steel fan assemblies and drive systems

  5. 5
    Week 5

    Installation of high-efficiency spray distribution system and pipework modifications

  6. 6
    Week 6

    Installation of anti-legionella packing, drift eliminators and cleansafe flooring

  7. 7
    Week 7

    Installation of access upgrades, doors, heaters and instrumentation

  8. 8
    Final Week

    Commissioning, performance testing and staged handover of cooling tower systems

"Vistech provided a technically sound and commercially pragmatic alternative to full cooling tower replacement. Their ability to refurbish our existing towers within a constrained Central London site significantly reduced programme risk and disruption. The upgraded system has delivered improved performance and confidence in long-term compliance."

Kristian Gjetani Leonari

Get in touch

The Vistech team are always happy to help with any stage of your cooling system project.

    Get in touch

    First Name *

    Last Name *

    Email *

    Telephone

    Your Enquiry*

    They trust us

    • Diageo Logo
    • Piramal Healthcare Logo
    • CBRE LOGO