Central London Delivery
The refurbishment was delivered within a constrained Central London environment, avoiding:
-
Cranage
-
Road closures
-
Structural modifications
-
Pipework reconfiguration
Split fan casings and modular internals enabled manual roof manoeuvring, reducing programme risk and minimising disruption.





