What we do

    Turn Key Solutions

    At Vistech we are dedicated to designing cooling solutions that provide you, our client, with the most efficient means of cooling for your needs.

    Refurbishment

    A cost effective solution for cooling towers reaching the end of their lifecycle or where business needs have changed the cooling demand.

    Installation

    Vistech are able to provide as much or as little support as required including mechanical, electrical and cranage requirements.

    Maintenance

    We can tailor maintenance packages to suit your specific requirements to ensure that issues are identified and addressed early.

    Performance Testing

    Following independent testing, the Vistech team will implement recommendations to deliver significantly improved cooling tower performance.

    Knowledge Centre

    Here you will find expert advice from our senior technical team. This is a resource that we will be building over time for our customers.

    Our Clients

    • We contacted Jason as he had worked with another site within the group. Jason visited site and looked at the current set up and worked with us to improve the system. Once the system had been approved the new cooling tower was delivered quickly. The onsite project manager over looked the whole project from start to finish making the installation an easy one. The overall support from start to finish from Vistech is second to none and I would recommend them again.

      William Cook

      J Austerfield
    • The project was handled competently and given the criticality of service and complexity of the project, to a very high standard and with total focus on service availability. There were issues and occurrences that were unforeseen but Vistech reacted positively to the challenges and their response was always exemplary, whether the issue was financial, project delays or safety concerns.

      Lloyd’s of London

      D Hart
    • Best reference would be that I didn’t even know you had been on site! All tools debris etc. cleared, quality of work exceptional.

      ESCO

      A Lane, Operations Manager (UK)
    • GRP Lining and new access door installed, quality product and service – many thanks.

      Chromalloy

      S Lawlor
    • Vistech were not phased by the issue and employed a contractor to completely reline the tank internally at their own cost and saved the down time and costs of removing and replacing the tank. I can confidently recommend Vistech to carry out any works of a similar nature and found the company from director to operative a pleasure to work with.

      Carillion

      D Hall, Works Manager
    • Excellent company to deal with, from sales to the lads who carried out the actual work, all very helpful.

      Baker Hughes

      P Madden
    • Following review of the proposal Vistech was selected as the supplier based on the proposed engineering solutions, ability to deliver within a required time together with resources and experience.

      Having been selected as the supplier Vistech produced all drawings and technical documentation as required and were always available to discuss any changes or questions as required. During the design stage of this project other operational situations within our business meant the timescales had to be altered and the project delivered to a quicker completion date and Vistech were able to support this and deliver the project ahead of schedule.

      As the project entered the installation stage all the team from both Vistech and their subcontractors were extremely professional and the standards of work were excellent leading to the project being delivered ahead of schedule, without any injuries or incidents and delivering the performance detailed within the initial proposals.

      In summary Vistech were a pleasure to work with on this project and delivered everything they promised they would do.

      Guernsey Electricity Ltd

      Lead Operations Engineer
    • Just want to say a big thanks for the work the guys done here last week. I was away from site so I had cover to supervise the job, but I have only heard positive feedback from everyone on site here. A really good job from what we can tell now, so should have the tower up and running from Thursday.

      Diageo

      Site Operations Manager

      Latest Cooling Systems Guides

      Ten Important Factors You Should Consider With A New Or Replacement Cooling Tower

      Free Download

      Seven key factors that must be monitored to combat legionella

      Free Download

      The design and operation of evaporative and dry water cooling systems

      Free Download

        Latest Articles